Land sourcing
Sites where power, fiber, zoning, water and local labor can support a data center.
Data center development
We find the site, secure the power, build the data center and lease the capacity, with our partners, across North America, Europe, Central America and the Gulf.
Step 1. Site
Land with a path to power
Step 2. Power
Grid connection or on-site generation
Step 3. Build
Design and construction with partner operators
Step 4. Compute
Capacity sold to AI and cloud tenants
Power first, land second. We start from where power can be delivered, and a site moves forward only when that power is real.
Sites where power, fiber, zoning, water and local labor can support a data center.
Grid interconnection, utility supply, and behind-the-meter gas where the grid will not arrive in time.
Municipalities, utilities and regulators, from a parcel to a site that can be built.
Data halls, electrical yards and on-site power, with partner operators.
Investors in the UAE and the Gulf who want exposure to power, land and compute.
Powered land, powered shells and long term capacity for AI and cloud tenants.
Next step
A site, a grid position, generation, or capital. Send a short note.
Tell us what you haveSelect a stage to see what is done, who is involved, and how long it tends to take.
Swipe
01
A first look at land that could hold a data center. Size, access, zoning, water, fiber, and whether power is even plausible.
Typical duration 2 to 6 weeks
A short list of sites worth a power screen
02
Before anyone spends time controlling the land, we check whether power can show up. Substations, the queue, a gas line, existing generation.
Typical duration 2 to 6 weeks
A yes, a no, or a conditional path to power
03
The stage that decides whether a project moves. We compare grid power, behind-the-meter gas and utility terms, and choose the path with the lowest risk to megawatts.
Typical duration 1 to 3 months
A power route with timeline and cost
04
Once power looks real, we secure the land. An option, a lease or a purchase, sized to the power we can actually use.
Typical duration 1 to 3 months
The site under control, on terms that match the power plan
05
Zoning, environmental review, and the permits a data center and any on-site generation need before construction.
Typical duration 3 to 12 months
A permitted project that can move into design
06
The chosen power route becomes an application. A grid interconnection, or a behind-the-meter gas plant with its fuel and permits.
Typical duration 3 to 18 months
A power path in process, with a date we can stand behind
07
The building, the electrical yard and the cooling, drawn to the power we have and the tenant we expect.
Typical duration 2 to 4 months
A buildable design tied to the power route
08
The project is structured so investors can fund land, power and construction, and see how capacity will be sold.
Typical duration 2 to 6 months
Capital committed to a defined project
09
Construction of the data center and the power systems, with the partner operators and contractors on that site.
Typical duration 12 to 24 months
A building and a power system ready to commission
10
Power, cooling and the building are tested until the site can take a real tenant load.
Typical duration 1 to 3 months
A site that can accept tenant load
11
Capacity goes to market. Powered land, a powered shell, or longer term compute for an AI or cloud tenant.
Typical duration 2 to 6 months
Capacity leased on agreed terms
12
The site runs. An operator partner keeps the building and the power commitment, and we stay on the relationship with the tenant.
Typical duration Ongoing
A site in operation, with power and capacity under contract
Five markets. One line each. The maps are locators, not a claim about a specific site.
Locator maps. Borders are simplified.
01
AI-scale campuses, where a site and its power can be put together.
02
Alberta: cold air, natural gas, and behind-the-meter generation.
03
Enterprise and sovereign demand, with tighter power and permitting.
04
A Central American market with a government open to technology investment.
05
Capital for power and land, and local demand for AI infrastructure.
Notes on land, power and data centers.
On 19 November 2026 Sharjah approved Kalba's free zone master plan: 285,000 square metres and a 400MW target. Power is still uncommitted.
Trump threatened a tax on US firms building data centers abroad, and a new BIS rule adds chip licences and KYC. What it means for land, power and capital.
Land, power, a project or capital. Send a short note and we will reply within two business days.